Top Menu
Language Select
  English  | Malay
W3C Color Changer
Theme: Blue and Green Theme: Red Theme: Green
Font Sizer
Background Changer
Background: 1 Background: 2 Background: 3 
 
 
Banner
Horizontal Main Menu
 
 
Last Updated Date
Last Update: 07 May 2015
Version 6.0.9
Footer Menu
Best Viewed
 
slide_53ad4875e1667.jpg
slide_53ad483b2bf48.jpg
slide_53ad47e0b800e.jpg
slide_53ad476570e48.jpg
slide_53ad470c987ec.jpg
slide_53ad45c5c2f61.jpg
 

ANNOUNCEMENT!!! - GST

Dear Customers,

The Board wishes to inform consumers that Malaysia GST accountability begins and commences effective from 1st April 2015, KWB water bill has been enhanced with new layout and feature to comply GST. GST will NOT be imposed to the water usage to DOMESTIC CONSUMERS. GST will be inclusive for water usage on other tariffs and all meter rental.


PLANNED WATER SUPPLY INTERRUPTION

Kuching Water Board wished to inform consumers that it would be carrying out disinfection work on the new storage reservior at Jalan Entinggan on

Date: From 17th April 2015 to 19th April 2015
Time: 10:00PM to 4:00AM


Consumers particularyly areas along Kuching Outer Ring Road, Jalan Datuk Mohd Musa from UNIMAS Roundabout to Ferry Point and Right Up to Asajaya/Sadong Jaya may experienced low water pressure or supply interruption. Consumers are therefore adviced to prepare for the said occasion.

Kuching Water Board wished to inform consumers that it would be carrying out pipe connection work at Taman Sourabaya Indah from 10:00PM on Friday, 17 April 2015 to 5:00AM on Saturday, 18 April 2015. The said pipe connection work will be postponed to the following day if the weather condition does not permit.

Consumers at Taman Sourabaya Indah, Taman Lebunda, Taman Demak Indah all and surrounding areas might or will experience water supply interruption during the said period. Consumers are therefore advised to be prepared for the said occasion.

Kuching Water Board wished to inform consumers that it would be carrying out pipe connection work at Jalan Rantau Panjang, Kuching from 10:00PM on Friday, 10 April 2015 to 5:00AM on Saturday, 11 April 2015. The said pipe connection work will be postponed to the following day if the weather condition does not permit.

Consumers at Jalan Rantau Panjang, Kampung Rantau Panjang, Jalan Bukit Nanas, Jalan Sungai Tapang Batu Kawa and all and surrounding areas might or will experience water supply interruption during the said period. Consumers are therefore advised to be prepared for the said occasion.

Kuching Water Board wished to inform consumers that it would be carrying out pipe connection work at Jalan Foochow No. 1 Kuching from 10:00PM on Friday, 10 April 2015 to 5:00AM on Saturday, 11 April 2015. The said pipe connection work will be postponed to the following day if the weather condition does not permit.

Consumers along Jalan Foochow No. 1, Jalan Three Hills, Jalan Sekama, Jalan Ming Ching, Taman Poh Ming and all of the surrounding areas will experience water supply interruption during the said period. Consumers are therefore advised to be prepared for the said occasion.

The Board regrets for any inconvenience caused to our consumers. All efforts will be made to restore the water supply back to normal in the fastest time possible.

News & Activities
No news at the moment
TALIKHIDMAT Application

 
Quote Of The Day
Water is H2O, hydrogen two parts, oxygen one, but there is also a third thing, that makes water and nobody knows what that is.
D.H. Lawrence, Pansies, 1929
Events


No event at the moment
Announcement
Service Hotline
Water loss is costly to all parties; your prompt reporting of leakages and unauthorized usage is highly appreciated.
 
KWB Hotline Numbers
Contact Us

Kuching Water Board
Jalan Batu Lintang,
Kuching, Sarawak.
Tel: 082-222 222
Fax : 082-222 259
Email : kwb@kwb.gov.my

KWB Mobile
Image of KWB Mobile Web
Newsletter
KWB Poll
KWB has made progress in water conservation.
 

Tender & Quotation
» No Tender & Quotation
   
   
Visitors
online visitor Online Visitors 6
total visitor Total Visitors 348,722