Top Menu
Language Select
  English  | Malay
W3C Color Changer
Theme: Blue and Green Theme: Red Theme: Green
Font Sizer
Background Changer
Background: 1 Background: 2 Background: 3 
 
 
Banner
Horizontal Main Menu
 
 
Last Updated Date
Last Update: 13 Feb 2015
Version 6.0.7
Footer Menu
Best Viewed
 
slide_54b389dc0ef7b.jpg
slide_54b385977b0ba.jpg
slide_53ad4875e1667.jpg
slide_53ad483b2bf48.jpg
slide_53ad47e0b800e.jpg
slide_53ad476570e48.jpg
slide_53ad470c987ec.jpg
slide_53ad45c5c2f61.jpg
 

PLANNED WATER SUPPLY INTERRUPTION

Kuching Water Board wished to inform consumers that it would be carrying out main pipe connection works of 160mm HDPE at Tmn Sentosa Phase 6 off Jln Stakan Melayu from 9:00AM to 4:00PM on Friday, 13 February 2015.

Consumers along Tmn Sentosa Phase 6 off Jln Stakan Melayu and all surrounding areas will experience water supply interruption during the said period. Consumers are therefore advised to be prepared for the said occasion.

Kuching Water Board wished to inform consumers that it would be carrying out main pipe connection works of 6" S.I. at Simen Raya Lorong 2 from 10:00PM on Friday, 06 February 2015 to 6:00AM on Saturday, 07 February 2015.

Consumers along Simen Raya Lorong 2 and all surrounding areas will experience water supply interruption during the said period. Consumers are therefore advised to be prepared for the said occasion.

Kuching Water Board wished to inform consumers at Taman Desa Ilmu and along the entire stretch of Jalan Kota Samarahan including Kampung Melaban, UITM Campus, Kampung Meranek, Kampung Langsai, Kampung Tanjung Parang up to Kota Samarahan (areas where the water supply is supplied by KWB through JKR) that it would be carrying out a valve replacement work at Jalan Datuk Mohd Musa from 10:00PM on Friday, 06 February 2015 to 3:00AM on Saturday, 07 February 2015.

The valve replacement works will be postponed to the following day if the weather condition does not permit.

The Board regrets for any inconvenience caused to our consumers. All efforts will be made to restore the water supply back to normal in the fastest time possible.

News & Activities
No news at the moment
Quote Of The Day
Water is H2O, hydrogen two parts, oxygen one, but there is also a third thing, that makes water and nobody knows what that is.
D.H. Lawrence, Pansies, 1929
 
KWB Mobile
Image of KWB Mobile Web
Tender & Quotation
» KWB/T/1/2015
   
   
   
   
 
Newsletter
Events


No event at the moment
Service Hotline
Water loss is costly to all parties; your prompt reporting of leakages and unauthorized usage is highly appreciated.
 
KWB Hotline Numbers
Announcement
Contact Us

Kuching Water Board
Jalan Batu Lintang,
Kuching, Sarawak.
Tel: 082-222 222
Fax : 082-222 259
Email : kwb@kwb.gov.my

Personalization Panel
FOR KWB STAFFS
Link to KWB Webmail
 
FOR KUCHING CITIZEN
Link To Complaint Form
KWB Poll
KWB has made progress in water conservation.
 

Visitors
online visitor Online Visitors 6
total visitor Total Visitors 318,838