Theme: Blue and Green Theme: Blue and Green Theme: Red Theme: Green
Background: 1 Background: 2 Background: 3 
 
 
 
 
Last Update: 26 05 2019
Version 8.2.1
 

Kuching Water Board wished to inform consumers that it would be carrying out main pipe connection works at Taman Highfield off Jalan Batu Kawa from 9.00AM to 4.00PM on Friday, 05 April 2019

Consumers along Taman Highfield off Jalan Batu Kawa and  all of the surrounding area may experience low water pressure or water supply interruption during the said period. Consumers are therefore advised to be prepared for the said occasion.

The Board regrets for any inconvenience caused to our consumers. All efforts will be made to restore the water supply back to normal in the fastest time possible.