Theme: Blue and Green Theme: Blue and Green Theme: Red Theme: Green
Background: 1 Background: 2 Background: 3 
 
 
 
 
Last Update: 23 07 2019
Version 8.2.1
 
<font color=#ff0000>PLANNED WATER SUPPY INTERRUPTION</font>PLANNED WATER SUPPY INTERRUPTION
Kuching Water Board wished to inform consumers that it would be carrying out pipe connection work at Jalan Tan Sri Datuk Amar Sim Kheng Hong from 10.00PM on Wednesday, 10 July 2019 to 5.00AM (or earlier) on Thursday, 11 July 2019. The said pipe connection work will be postponed to the following day if the weather condition does not permit. 

Consumers at along and around from Jalan Sim Kheng Hong, Jalan Dato Bandar, Jalan Berjaya, Jalan Cahaya, Jalan Lalulintas, Jalan Chawan and all surroundings area will experience low water pressure or water supply interruption during the said period. Consumers are therefore advised to be prepared for the said occasion.

Kuching Water Board wished to inform consumers that it would be carrying out pipe connection work at Mile 10, Jalan Kuching/ Serian from 10.00PM on Wednesday, 3 July 2019 to 5.00AM on Thursday, 4 July 2019

Consumers along from Mile 9 to Mile 16 Siburan Jalan Kuching/ Serian, Mile 16 Siburan to JBALB water supply area, Jalan Kuap, Sri Arjuna Booster Station Mile 10, Jalan Landeh, Jalan Puncak Borneo and JBALB water supply area will experience low water pressure or water supply interruption during the said period. Consumers are therefore advised to be prepared for the said occasion.

The Board regrets for any inconvenience caused to our consumers. All efforts will be made to restore the water supply back to normal in the fastest time possible.